Meco is an operational data center in Madrid, Spain, run by Microsoft (Azure), with an estimated 48 MW of live IT capacity. The figure is based on published IT capacity. Over the 12 months to June 2025, Microsoft's three Madrid sites together drew ≈2.6 MW of electricity on average, as the operator reports it for the metro; the figure is not divided between sites.