Estonia
Estonia has 6 operating data centers in our registry, and we estimate 11 MW of data center capacity in the country. About 2.6 MW of that is colocation and hyperscale capacity we track directly. Most of the rest is modelled enterprise capacity on sites the registry does not hold.
Total capacity
11 MW
19% published · 5% floor area · 76% modelled
Tracked sites
6
Colocation, hyperscale, enterprise and hosting sites we hold evidence for
Colocation + hyperscale
2.6 MW
Across 5 sites
Sites under construction
Coming soon
  • Colocation2.6 MW
  • Enterprise and hosting, modelled8.1 MW
Of the total: 19% published · 5% floor area · 76% modelled. Data as of 11 November 2026.

Estonia is a small data center market centered on Tallinn, served by one large colocation campus and a handful of smaller telecom and hosting facilities. The largest, Greenergy Data Centers at Hüüru on the edge of Tallinn, opened in 2022 and is adding a hall with 22 MW of IT power and raising its grid connection to 31.5 MW.

Two much larger projects are at an early planning stage in western Estonia: the Risti campus of Sunly and Magnora, planned at 180 MW in its first phase, and a data center of up to 100 MW near Lihula, whose detailed plan was initiated in July 2026.

Top 3 largest data centres

Greenergy Data Centers Tallinn (Hüüru)
≈2.0 MW
from the live buildings
CITIC Telecom Tallinn
≈0.6 MW
estimated from floor area