Denmark
Denmark has 23 operating data centers in our registry, and we estimate 396 MW of data center capacity in the country. About 352 MW of that is colocation and hyperscale capacity we track directly.
Total capacity
396 MW
18% published · 71% floor area · 11% modelled
Tracked sites
23
Colocation, hyperscale, enterprise and hosting sites we hold evidence for
Colocation + hyperscale
352 MW
Across 22 sites
Sites under construction
Coming soon
  • Colocation43 MW
  • Hyperscale309 MW
  • Enterprise and hosting, modelled43 MW
Of the total: 18% published · 71% floor area · 11% modelled. Data as of 10 October 2026.

Denmark has become one of Europe’s most sought-after data center locations, combining clean and low-cost power, low-latency connectivity and a developed district heating system that can absorb waste heat. Several hyperscalers operate large campuses in the country, and its attractiveness for investment is well established.

That demand has put the grid under strain. Around 60 GW of new consumption projects are waiting for connection, roughly nine times the country’s 7 GW peak demand, which led the transmission operator Energinet to temporarily pause new connections. An emergency law, expected to take effect in October 2026, splits connection requests into four priority categories with data centers placed last; projects in the lower categories are ranked on grid-friendliness and assessed in batches, and data centers can be refused when grid capacity is short.

Top 3 largest data centres

Meta Odense Data Centre
≈165 MW
estimated from floor area
Google Fredericia
≈42 MW
estimated from floor area
Apple Foulum (Tjele, Viborg)
≈32 MW
from the live buildings