Middenmeer, Agriport 570 is a partially operational data center campus in the Netherlands, run by Microsoft (Azure), with an estimated 270 MW of live IT capacity. The figure adds up its buildings in service: published capacity where it exists, estimates from floor area for the rest. It has nine buildings in service. In 2025, the site drew ≈154 MW of electricity on average, with an IT load of about 49% of its building capacity.