Clonee Data Centre is an operational data center campus in County Meath, Ireland, run by Meta, with an estimated 180 MW of live IT capacity. The figure is its published grid connection, which usually overstates the IT load behind it. It has five buildings in service. Its electricity is stated to come from renewable sources. In 2025, the site drew ≈135 MW of electricity on average, with an IT load of about 69% of its building capacity.