Microsoft Grange Castle Campus is a partially operational data center campus in Dublin, Ireland, run by Microsoft (Azure), with an estimated 325 MW of live IT capacity. The figure adds up its buildings in service: published capacity where it exists, estimates from floor area for the rest. It has 12 buildings in service. The site dates from 2009. One of its 14 buildings has a published grid connection of 40 MW. Over the 12 months to June 2025, Microsoft's Dublin operations drew ≈149 MW of electricity on average, as the operator reports it for the metro; the figure is not divided between sites.